The coverage and documentation required by the permit is dependent on the exposure of processes or materials. Facilities must be inspected by a stormwater inspector, regardless of coverage, if the SIC code is in the permit. The goal of the inspection is to educate the business’s personnel on how to reduce the potential for stormwater pollution. Educational brochures for industrial sectors from the United States Environmental Protection Agency can be found on the bottom of this page.